Sandwich panels are strong enough to carry loads from their own weight, so they can be used to build frameless cold and freezer rooms.

In this article we will go through, step by step,

  • the detailed installation of cold rooms from sandwich panels
  • how to install the corners correctly when building a cold room

For installation you will need the following consumables:

  • fixing self-tapping screws
  • anchor bolts
  • silicone sealant and mounting foam

Now let us move on to the detailed description of the steps for installing cold rooms from sandwich panels.

1. Mark the outer dimensions of the room on the floor

1.png

2. According to the assembly diagram, install the channel along the marking and fix it to the floor with anchors

The channel corners must be positioned in accordance with the layout of the panels in the assembly diagram. Do not install the channel at the door opening.

2.png

To fix the channel you need to:

  • align the channel along the marking
  • drill a hole in the floor
  • drive a wedge anchor into the hole

3.png

The wedge anchor must be installed at 500 mm intervals.

4.png

3. According to the assembly diagram, install the first panel corner

To do this you need to:

1. Cut off the tongue of one panel

5.png

2. Apply sealant to the groove of this panel.

6.png

3. To prevent a cold bridge, on the sandwich panel whose end face is visible from the outside of the room, cut out a 10 mm wide strip of metal along the entire length of the panel.

7.png

4. Place the sandwich panels into the channel.

8.png

5. Position the sandwich panels so that a 15 mm gap forms between them for subsequent foaming.

9.png

6. Fix the panels from below with self-tapping screws through the channel.

10.png

4. Install the next panel into the channel

1. Apply sealant to the groove of the panel.

11.png

If the room is a low-temperature one, remove the film from the panel groove and apply mounting foam to the panel tongue. If the room is a medium-temperature one, removing the film and applying foam is not necessary.

12.png

2. Place the panel into the channel and insert its tongue into the groove of the panel that is already installed.

13.png

It is permissible to temporarily fasten the panels with a self-tapping screw driven into the panel lock.

14.png

3. Fix the panel from below with self-tapping screws through the channel, as for the first corner.

15.png

5. Continue installing the wall as described in step 4 until a panel needs to be cut

16.png

6. Installing the second corner

1. According to the assembly diagram, cut the sandwich panel into two parts.

19.png

2. Install the second corner in the same way as the first: set the 15 mm gap to prevent a cold bridge and fix the panels with offcuts of angle sections.

18.png

7. Install the second wall of the first corner in the same way as the first wall

In this case the door opening is located on the second wall of the room. The door opening is not shown in the room assembly diagram and is positioned at the customer’s discretion.

It is permissible to cut an opening in two adjacent panels if the width of the opening exceeds 785 mm. Important! The distance from the edge of the opening to the sandwich panel lock must not be less than 200 mm.

The door opening should be cut in the panels before installing them. Cutting the opening in an installed wall on site is permissible but not recommended.

8. Installing the third corner

1. According to the assembly diagram, cut the panel into two parts.

19.png

2. Install the third corner in the same way as the first two. Set the 15 mm gap to prevent a cold bridge and fix the panels with offcuts of angle sections.

20.png

9. Continue installing the walls as described in step 4 until the sandwich panels need to be cut

21.png

10. Installing the fourth corner

According to the assembly diagram, cut the panels and install the fourth corner in the same way as the other three corners.

22.png

11. Installing the first ceiling panel

23.png

Install the first ceiling panel with a 15 mm gap and align it with the outer dimensions of the room, fix it with offcuts of outer and inner angle sections.

24.png

12. Continue installing the ceiling sandwich panels as described in step 4

25.png

13. Install the last ceiling sandwich panel

According to the assembly diagram, cut and install the last ceiling panel.

26.png

27.png

14. Foam all the gaps at the corners and between the ceiling and the walls

28.png

After foaming, remove the 15 mm spacers and foam the places where they were installed, remove the angle offcuts and the fixing screws from the locks.

29.png

15. Install the shaped elements

30.png

Shaped elements are fixed with self-tapping screws. Before installation, apply sealant to the places where the shaped elements and the panels touch.

31.png

16. Install the door leaf

Now you know how to build a cold room from sandwich panels and how to install the corners correctly!
To find out how to install a door on a cold room, see the detailed video instructions on our website.

If you have any questions, contact your personal manager or write to info@profholod.ru

Subscribe to updates of our knowledge base

And you will be the first to receive the latest recommendations from our engineers

More useful articles

We explain which characteristics of sandwich panels you should pay attention to in order not to make a mistake
10.12.2024
Can administrative buildings be built from sandwich panels with PIR Premier insulation
06.02.2024
Learn the important points of installing sandwich panels
02.02.2024
A balcony is insulated once – it is important to do it right the first time
13.09.2023

See our
projects

gototop