Challenge

ProfHolod needed to build a new sandwich panel production workshop to install a new continuous line. The production site is located in Shchelkovo, Moscow Region.

Solution

More than 3,400 sq. m of sandwich panels with PUR Classic insulation in three corporate colors, plus shaped profiles, were used to build the workshop. To use renewable energy sources in sandwich panel production, a 19.2 kW solar power plant was installed on the building in 2016. The plant was designed and built by SolarOn, the first manufacturer of solar modules in Armenia.

In 2023, ProfHolod commissioned a new 552 kW solar power plant. The plant is the largest in the Shchelkovo District. From December 2022 to mid-May 2023, the solar panels generated 198 MWh of electricity. The total capacity of ProfHolod's solar power plant will be increased to 800 kW: the sun will provide up to 50% of the company's electricity needs.

alt
alt
alt

Building a similar facility?

Request a free consultation today and we will get back to you within an hour during business hours.

gototop