PH Insulation has reduced the lead time of sandwich panels for all types of medium and low-temperature refrigerating chambers to 14 calendar days from the date of payment.

Reduced lead times apply to

  • zero waste chambers. Price lists are available on the company's website
  • modular chambers with eccentric locks and the improved door block. Modular chambers can significantly increase installation speed due to a pre-installed door, provide savings on shaped elements and reduce the amount of waste on the construction site
  • non-standard chambers of any kind: with internal partitions, corner cutouts, multiple door blocks, hinged doors inside sliding doors, doors under monorails, with embedded elements inside sandwich panels, and so on

cold_room.jpg

PH Insulation ensures short production times and quality through long-term partnerships with the largest suppliers of metal and raw materials, digitalization of technological processes, quality control in its own accredited laboratory and operation of two continuous and one periodic lines for the production of sandwich panels.

Every year PH Insulation produces more than 3 million square meters of sandwich panels with three types of insulation: PIR Premier, PUR Classic and mineral wool.

Sign up to our newsletter

All the most useful and interesting once a week

More news

ProfHolod confirms the high quality of its products through quality certificates
05.03.2026
We continue to review the results of the past year regarding sandwich panel production.
03.02.2026
For construction of the new building were used PH Insulation’s sandwich panels with PIR Premier, refrigeration doors, and PIR Plita® insulation boards.
09.06.2025
Minimum production times apply to products in standard colors and sizes
04.06.2025

See our
projects

gototop