Dairy Factory
-
>1,700 m²
-
13 pcs
-
7 pcs
-
4 pcs
-
3 pcs
Challenge
The customer needed to insulate and modernize the concrete building of a dairy plant in Shchuchinsk, Kazakhstan.
Solution
For insulation, more than 1,700 sq. m of ProfHolod PIR Premier wall panels 40 mm thick, made from the best foreign components, were used; for modernization, 13 technological, 7 swing, 4 sliding and 3 hinged ProfHolod doors with European hardware.
ProfHolod swing and sliding doors are made with an opening for a monorail used to transport large-sized products. To extend the service life of the doors, the leaves are protected by bump guards of different types: flat and curved plastic ones and Quintet-type metal sheets.
According to the European association PU Europe, using PU-based insulation 115 mm thick saves 162 kWh per sq. m of insulated surface every year. Polyurethane foam does not absorb moisture and is resistant to fungi and mold, so it is especially suitable for insulating facilities that operate at high humidity levels, such as dairy farms.
Similar projects
Building a similar facility?
Request a free consultation today and we will get back to you within an hour during business hours.